New Smith Building on the Horizon - Y Magazine
Check out the latest podcast episode Listen
BYU Today

New Smith Building on the Horizon


the Joseph F. Smith building

If funding is in place, constriction of the five-level Joseph F. Smith Building will begin mid-2002 and become completed near the end of 2004. The generous use of glass in the design will bring natural light into many of the classrooms, labs, and offices. The building will accommodate the entire faculty of the College of Humanities and five departments from the College of Family, Home, and Social Sciences, including the School of Family Life.

If funding is in place, construction of the five-level Joseph F. Smith Building will begin mid-2002 and be completed near the end of 2004. The generous use of glass in the design will bring natural light into many of the classrooms, labs, and offices. The building will accommodate the entire faculty of the College of Humanities and five departments from the College of Family, Home, and Social Sciences, including the School of Family Life.